Bolu Province, Highway Shopping Mall- Traffic Analysis and Parking Revision Project After the field studies which are held by our team, 2 main problems have been detected. 1. Different types of vehicles such as automobiles, motocycles and trucks were using the same parking areas. In terms of traffic safety, different means of vehicles should use different parking areas. 2. The other problem was that the vehicles which comes from Istanbul (west side) and Ankara ( east side) were using the same junctions and this situtation creates high accidental risks as well. Additionally, current traffic plan allowed 2 other entrance within 55 meters, these entrances also were not satisfying the needs and did not solve the problem In the action plan of the advisory report, Our team recommended these below:
In 2018, PALYE conducted a "General Traffic and Parking Revision Project" at the aforementioned parking area.
The parking area revision project has been completed, with careful attention given to the driving geometry of different vehicle types.