{"id":801,"date":"2021-06-28T01:35:11","date_gmt":"2021-06-27T22:35:11","guid":{"rendered":"https:\/\/palye.com.tr\/?page_id=801"},"modified":"2021-06-28T01:35:27","modified_gmt":"2021-06-27T22:35:27","slug":"sasa-trafik-duzenlemesi","status":"publish","type":"page","link":"https:\/\/palye.com.tr\/en\/sasa-trafik-duzenlemesi\/","title":{"rendered":"SASA Traffic Study"},"content":{"rendered":"

A circulation plan was prepared in the factory site of Sasa Polyester Entrance doors to be used at the entrance and exit to the factory site were planned. Asphalt and road application projects were prepared. Simulations were prepared.<\/p>\n\n\n\n

<\/p>\n\n\n\n

\"\"
Image 17<\/figcaption><\/figure>\n\n\n\n

<\/p>","protected":false},"excerpt":{"rendered":"

A circulation plan was prepared in the factory site of Sasa Polyester Entrance doors to be used at the entrance and exit to the factory site were planned. Asphalt and road application projects were prepared. Simulations were prepared.<\/p>","protected":false},"author":2,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"_links":{"self":[{"href":"https:\/\/palye.com.tr\/en\/wp-json\/wp\/v2\/pages\/801"}],"collection":[{"href":"https:\/\/palye.com.tr\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/palye.com.tr\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/palye.com.tr\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/palye.com.tr\/en\/wp-json\/wp\/v2\/comments?post=801"}],"version-history":[{"count":1,"href":"https:\/\/palye.com.tr\/en\/wp-json\/wp\/v2\/pages\/801\/revisions"}],"predecessor-version":[{"id":803,"href":"https:\/\/palye.com.tr\/en\/wp-json\/wp\/v2\/pages\/801\/revisions\/803"}],"wp:attachment":[{"href":"https:\/\/palye.com.tr\/en\/wp-json\/wp\/v2\/media?parent=801"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}