{"id":418,"date":"2021-04-10T07:46:14","date_gmt":"2021-04-10T07:46:14","guid":{"rendered":"https:\/\/www.dartpad.xyz\/palye\/?page_id=418"},"modified":"2021-06-14T14:57:30","modified_gmt":"2021-06-14T11:57:30","slug":"yol-ve-trafik-planlamasi","status":"publish","type":"page","link":"https:\/\/palye.com.tr\/en\/road-and-traffic-planning\/","title":{"rendered":"Road and Traffic Planning"},"content":{"rendered":"
While vehicle ownership and traffic volume increase rapidly in cities, road networks and capacity do not increase at the same speed and this causes bottlenecks.<\/p>\n Especially the problems experienced in the zoning plans and the high expropriation costs make it difficult to open new road networks.<\/p>\n In this case, the most important solution is to use the existing capacity efficiently. The willingness of the administrations to produce economic solutions makes it obligatory to bring suggestions on the subject.<\/p>\n For more efficient use of road networks and for the solution of congestion at intersections;<\/p>\n Otopark alanlar\u0131n\u0131n olu\u015fturulmas\u0131, yatay ve d\u00fc\u015fey i\u015faretlemelerin yap\u0131lmas\u0131, sinyalize kav\u015faklarda optimum s\u00fcrelerin planlanmas\u0131, bisiklet yollar\u0131n\u0131n tasarlanmas\u0131, yayala\u015ft\u0131rma \u00f6nerilerinin geli\u015ftirilmesi ile birlikte s\u00fcrd\u00fcr\u00fclebilir bir trafik y\u00f6netim sisteminin kurulmas\u0131 i\u00e7in yol ve trafik d\u00fczenleme projeleri haz\u0131rlanmaktad\u0131r.<\/p>\n In order to solve the existing problems, we make investigations in the field with our expert team, and we collect existing and new data. We produce transportation plans based on the analysis of the collected data in the office environment.<\/strong><\/p>\n The project consists of the following stages.<\/p>\n \u2022 Traffic counts to measure traffic volume on roads and junctions. \n<\/div><\/div><\/div><\/div><\/div><\/section>
\n\u2022 Preparation of circulation plans.
\n\u2022 Preparing geometrical arrangement and parking lot projects.
\n\u2022 Preparing simulations.
\n\u2022 Preparation of horizontal and vertical marking projects.
\n\u2022 Preparation of signaling plans.
\n\u2022 Development of bicycle and pedestrian way projects.<\/p>\n